Skip to content
UA Discuss your project
  1. Home
  2. Resources
  3. Line and equipment downtime: how to measure it with a camera when there are no sensors or MES

Line and equipment downtime: how to measure it with a camera when there are no sensors or MES

6 min read · Updated 2026-11-18

Author: DuoVision team

For: production owners, production directors, workshop and shift managers, process engineers

Summary

  • A camera over a line can record when a belt or machine stopped, when a station is empty and how long it lasted, with no sensors on the equipment and no MES.
  • This gives the basis for the availability figure in OEE: the share of planned time the line actually ran.
  • The camera does not know the cause of a stop. The foreman enters it when opening the card with the frame, and after a few weeks you can see which causes take the most time.
  • We set it up for your line: shadow mode on your footage first, and we show the report before launch.

For: production owners, production directors, workshop and shift managers, process engineers

Why downtime is hard to see without data

On a line without sensors or MES, downtime is known from stories: the shift says "we stood for half an hour", the foreman remembers two big stops out of three. Short stops of a few minutes are written down by nobody, and together they can exceed one large breakdown.

Cameras in the workshop are usually already there, but people watch them after the event. Video analytics can watch every time and record the start and end of each stop.

What exactly a camera can measure

  • Line stop: a belt, conveyor or unit in the frame stopped moving. The camera sees motion, not motor state, so we set the rule for what is visible on your line.
  • Empty station: a table, packing post or loading post with nobody there for longer than a set time.
  • Duration and count: how many stops per shift, how long each lasted and how long the longest was.
  • Downtime by shift, area and day.

What a camera does not see: what happens inside a machine, why the line stopped and how fast it runs inside its housing. That takes sensors or the foreman's word. So we do not promise a full cause log from video. We give exact time and a frame, and a person attaches the cause.

How this maps to OEE

OEE (overall equipment effectiveness) is the product of three factors: availability, performance and quality. This is how OEE.com, a resource run by Vorne, describes it. In that method availability is run time divided by planned production time, and stop time covers both unplanned downtime (breakdowns) and planned downtime (changeovers).

An example from the same source: 420 planned minutes, 47 minutes of downtime, run time 373 minutes, availability 373 / 420 = 88.81%.

This is the part a camera covers: it gives the duration and number of stops. Performance (speed and small stops belong to it in the Vorne method) and quality (defects) we do not calculate from video alone: they need product counters, which is a separate conversation about your systems. For most workshops without MES, availability alone already shows where time goes.

What the report looks like

Each stop arrives as a card: camera, area, start time, end time, duration, frame. The foreman or shift manager opens the card and picks a cause from a list you define together with us: waiting for raw material, changeover, breakdown, waiting for a person, cleaning.

The daily or weekly report assembles this table:

AreaStops per shiftTotal downtimeLongest stopAvailability
Line 1countminutesminutesshare of planned time
Packing postcountminutesminutesshare of planned time

This is the layout of a report, not a result from a specific plant: the values come from your footage. A split by cause appears separately once causes are logged.

When a camera is more useful than a sensor

  • The equipment is old or mixed, and putting sensors on every unit is expensive or impossible.
  • Downtime consists of human stops: a station with nobody at it, waiting, a break in the middle of a shift. A sensor on the motor will not show that.
  • You need a fast start: the cameras are already there, while sensors and MES need a project and time.
  • You need a frame as evidence in a talk with the shift or the equipment supplier.

If you already have sensors or MES, a camera complements them: it shows what those systems do not see and confirms their data with a frame.

Where to start

  1. Pick one line or area where downtime hurts most.
  2. Check whether an existing camera sees it fully: the belt, the post and the person.
  3. Define what counts as a stop: how many minutes without motion, and in which hours the line should run.
  4. Give us footage from a few shifts: we will set up the rule for your line and show the report before launch.

Similar logic for warehouses is described in the articles on dock losses and video analytics for warehouses. For production in general, see the production solutions page. You can discuss your line through contacts.

Where to apply this

Sources

  1. OEE.com (Vorne). Calculating OEE
  2. OEE.com (Vorne). Overall Equipment Effectiveness

Let’s discuss your site

Request a consultation or a project estimate. We will tell you what your cameras can monitor, where it is best to process the video and how much it will cost.